menu
Logo
Ohio Football Topic
Topic: IPF Update
Page: 2 of 2
mf279801
General User
M279801
Member Since: 8/6/2010
Location: Newark, DE
Post Count: 2,486
person
mail
mf279801
mail
Posted: 5/11/2013 1:32 PM
Uncle Wes wrote:expand_more
based on the sketch of the building it looks like it's going to run parallel to the field, correct? by building this right behind the student side will this potentially limit the possibility of ever rebuilding Peden and/or expanding it?


The student side is already pretty large, foot-print wise, and not very steep. I feel like any expansion (which I wouldn't predict happening any time soon!) wouldn't entail moving "out" so much as rebuilding it more vertically, or with a second level.


If a second level is going to be built it makes sense to just tear the first level down and rebuild the whole side. The pitch of he stands could be improved to match the corner seats and without that needless causeway in front of the first row behind the benchbacks. All the plumbing and electrical infrastructure is there along that side to be reconfigured. A new locker room that matches the design of the Carin Center could be built adjacent to the new student stands to fill Peden in more. Improve the acoustics to make the stadium louder.


I agree with you 100%, never meant to imply otherwise
Showing Messages: 26 - 26 of 26
MAC News Links



extra small (< 576px)
small (>= 576px)
medium (>= 768px)
large (>= 992px)
x-large (>= 1200px)
xx-large (>= 1400px)