Ping Center was built with a special student assessment and there is talk of relocating the ice rink and swimming pool there. Could another assessment for the Ping Center work and throw in a new student side for Peden at the same time? That may be the best way to get it done.
I had heard about moving the ice rink next to Ping.
The rationale was to save on energy costs.
I know they had talked about a new aquatic center.
But I thought they were looking at a couple of possible locations.
Haven't heard anything about either project for a while.
As I've posted before,if the ice rink project goes ahead,
it should be possible to convert Bird Arena to a Practice Facility
for basketball and volleyball.
Since you've already got the building,it would be a lot cheaper then
starting from scratch.
To me,the Practice Facility is more critical then improvements to
student side of Peden.