I saw the full color sketch of the academic center and it is very impressive. It really blends well with Peden and combined with the new IPF it will really help in recruiting for all sports.
I expected something top notch. A few questions. How tall is it relative to the seats in the end zone? There was talk of seats around the center and where would they go? Does it completely fill in the gap in the end zone? Do you know anything about the timeframe for it?
I saw the drawing, but it was a quick glance of maybe 10 or 15 seconds. The drawing I saw was from the outside of the stadium as if I was standing where the baseball field used to be. The structure was two levels, maybe three and was rounded to match the contour of the end-zone seating sections. The structure is brick with lots of tinted windows and appeared to fill in most of the space between the two sections of seats. It gives the stadium a very finished look and should help balance out the fact the IFP is so big next to the stadium as it is now. It should help retain some of the crowd noise within the stadium for our advantage. I did not see the side of the structure within the stadium but I would assume the design would allow for some type of utilization during game day activities.
Last Edited: 5/6/2014 10:35:27 PM by Bobcat Grad 86